2006 09 Kitchen Remodel

 

Home

Projects

2006 03 08 Kitchen, Before

2006 09 01 Cabinets in Progress

2006 09 05 Demolition Starts

2006 09 07 Demolition, Problems

2006 09 14 Vent and Posts Move I

2006 09 19 Vent and Posts Move II

2006 09 23 Floor Starts

2006 09 25 Cabinets in Progress

2006 09 25 Tile

2006 09 30 Tile, Structural

2006 10 07 Progress

2006 10 10 Cabinets in Progress

2006 10 12 Sheetrock

2006 10 16 Sheetrock, Lighting

2006 10 20 Paint, Cabinet Layout

2006 10 21 Cabinet Install Day 1

2006 10 22 Cabinet Install Day 2

2006 10 23 Cabinet Install Day 3

2006 10 26 Cabinets, Templates, Appliances

2006 10 31 Waiting

2006 11 22 In Use

2006 12 24 In Use

 

 

2006 09 25 Tile

Today the electrician was here getting more wire in the walls and moving things around, and work started on the new floor. The first of the next three snaps shows some of the slate floor out in the drive being sealed. The middle snap shows some of the remaining Durock being screwed down. The last is tile being set.

Some more tile laid out in the garage for sealing. The entire floor will get at least two more coats of sealant. The last shows the first few rows of tiles in place. (The floor is a natural slate called "Indian Peacock".)